List of Figures
| Table of Contents | List of Figures | List of Tables |
- Figure 1-1. Sources of Information About the Indigo2 IMPACT Workstation
- Figure 1-2. Workstation Owner's Guide
- Figure 1-3. Software Installation Guide
- Figure 1-4. RIS InSight Icon
- Figure 2-1. Indigo2 IMPACT Parts
- Figure 2-2. Opening the Front Cover
- Figure 2-3. Releasing the Bezel
- Figure 2-4. Removing the Bezel
- Figure 2-5. Installing an Option Drive
- Figure 2-6. Replacing the Bezel
- Figure 2-7. Attaching the Workstation Stand to the Workstation
- Figure 2-8. Placing Your Workstation Under Your Desk
- Figure 2-9. Placing the Monitor on Top of Your Indigo2 IMPACT Workstation
- Figure 2-10. Connecting the Monitor Cable to the Indigo2 IMPACT Workstation
- Figure 2-11. Connecting the Keyboard Cable
- Figure 2-12. Connecting the Mouse Cable
- Figure 2-13. Connecting the Microphone
- Figure 2-14. Audio Ports
- Figure 2-15. Installing SCSI Terminator
- Figure 2-16. Ethernet AUI Port
- Figure 2-17. Connecting the Standard Ethernet Cable
- Figure 2-18. Attaching an Ethernet 10-BASE T Cable
- Figure 2-19. Attaching the Power Cable to the Monitor
- Figure 2-20. Attaching the Power Cable to the Indigo2 IMPACT Workstation
- Figure 2-21. Turning On the Indigo2 IMPACT Workstation
- Figure 2-22. Running the Power-On Diagnostics Notifier
- Figure 2-23. System Startup Notifier
- Figure 2-24. System Is Coming Up Notifier
- Figure 2-25. The Login Screen
- Figure 2-26. The EZsetup Screen
- Figure 2-27. Desktop Icons
- Figure 2-28. CD Player Icon
- Figure 2-29. The Minimized Console Window
- Figure 2-30. The Toolchest
- Figure 2-31. IRIS InSight Icon
- Figure 2-32. Opening the Front Cover
- Figure 2-33. Pressing and Releasing the Power Switch
- Figure 2-34. System Shutdown Notifier
- Figure 2-35. Power Switch and Reset Switch
- Figure 2-36. The Toolchest
- Figure 2-37. System Shutdown Caution Message
- Figure 2-38. System Shutdown Notifier
- Figure 2-39. Okay to Power Off Notifier
- Figure 2-40. Starting Up the System Notifier
- Figure 2-41. Installing the Lockbar
- Figure 2-42. Locking the Indigo2 IMPACT Workstation
- Figure 3-1. Opening the Cover
- Figure 3-2. Powering Off the System
- Figure 3-3. Releasing the Bezel
- Figure 3-4. Removing the Bezel
- Figure 3-5. Releasing the Top Cover
- Figure 3-6. Removing the Top Cover
- Figure 3-7. Locating the SIMM Sockets
- Figure 3-8. Disconnecting the SCSI Cable
- Figure 3-9. Disconnecting the Midplane Power Cables
- Figure 3-10. Identifying the SIMM Slots and Banks
- Figure 3-11. Orienting the SIMM When Facing the Rear of the Workstation
- Figure 3-12. Tilting the SIMM Up to a Vertical Position
- Figure 3-13. Connecting the Midplane Power Cables
- Figure 3-14. Replacing the Top Cover
- Figure 3-15. Replacing the Bezel
- Figure 3-16. System Startup Notifier
- Figure 3-17. System Is Coming Up Notifier
- Figure 3-18. Releasing the Bezel
- Figure 3-19. Removing the Bezel
- Figure 3-20. Releasing the Top Cover
- Figure 3-21. Removing the Top Cover
- Figure 3-22. Locating the SIMMs
- Figure 3-23. Removing the 5-1/4" Drive Tray
- Figure 3-24. Disconnecting the Midplane Power and Twisted-Pair Cables
- Figure 3-25. Removing a SIMM
- Figure 3-26. Connecting the Midplane Power Cables
- Figure 3-27. Replacing the 5-1/4" Drive Tray
- Figure 3-28. Replacing the Top Cover
- Figure 3-29. Replacing the Bezel
- Figure 4-1. Opening the Front Cover
- Figure 4-2. Powering Off the System
- Figure 4-3. Releasing the Bezel
- Figure 4-4. Removing the Bezel
- Figure 4-5. Releasing the Top Cover
- Figure 4-6. Removing the Top Cover
- Figure 4-7. Locating the Option Slots
- Figure 4-8. Removing the Retention Pin
- Figure 4-9. Locating the EISA and GIO Connectors
- Figure 4-10. Identifying Board Slots
- Figure 4-11. Placement of Option Board
- Figure 4-12. Removing the I/O Panel
- Figure 4-13. Installing the Option Board
- Figure 4-14. Replacing the Retention Pin
- Figure 4-15. Closing the Metal Panel in Front of the Option Slots
- Figure 4-16. Replacing the Top Cover
- Figure 4-17. Replacing the Bezel
- Figure 4-18. Turning On the Indigo2 IMPACT Workstation
- Figure 4-19. Opening the Metal Panel in Front of the Option Slots
- Figure 4-20. Removing the Retention Pin
- Figure 4-21. Unscrewing the Option Board From the Indigo2 IMPACT Chassis
- Figure 4-22. Replacing the Metal Port Cover
- Figure 4-23. Replacing the Retention Pin
- Figure 5-1. Opening the Front Cover
- Figure 5-2. Powering Off the System
- Figure 5-3. Releasing the Bezel
- Figure 5-4. Removing the Bezel
- Figure 5-5. Releasing the Top Cover
- Figure 5-6. Removing the Top Cover
- Figure 5-7. Lowering the Metal Panel in Front of the Expansion Slots
- Figure 5-8. Removing the Screws From the Metal Extension
- Figure 5-9. Releasing the Retention Pin
- Figure 5-10. Removing the Board Set From the Chassis
- Figure 5-11. Solid IMPACT Graphics Board
- Figure 5-12. Solid IMPACT Graphics Board With Connected Option Boards
- Figure 5-13. High IMPACT Graphics Board Set With Texture Memory Option Board
- Figure 5-14. High IMPACT Graphics Board Set With Connected Option Boards
- Figure 5-15. Maximum IMPACT Graphics Board Set With Texture Memory Option Boards
- Figure 5-16. Maximum IMPACT Graphics Board Set With Texture Memory Option Boards and Connected Option Board
- Figure 5-17. Standoff Wrench
- Figure 5-18. Disconnecting the Ribbon Cable
- Figure 5-19. Removing Standoff Screws
- Figure 5-20. Disconnecting the Pull Straps
- Figure 5-21. Releasing Flex Connectors
- Figure 5-22. Removing Flex Cable From Connectors
- Figure 5-23. Identifying Flex Cables That Connect to an Option Board
- Figure 5-24. Removing the Option Board Flex Cables From the IMPACT Graphics Board
- Figure 5-25. Installing the Flex Cables on the Upgrade IMPACT Graphics Board Set
- Figure 5-26. Determining the Location of the Texture Memory Option Board
- Figure 5-27. Removing the Texture Memory Board
- Figure 5-28. Installing the Texture Memory Board
- Figure 5-29. Seating the Texture Memory Board
- Figure 5-30. Seating the Push Pins
- Figure 5-31. Removing the Screws From the Standoffs
- Figure 5-32. I/O Wrench
- Figure 5-33. Removing I/O Panel Screws
- Figure 5-34. Rotating the Top Board to an Open Position
- Figure 5-35. Location of Texture Memory Board on Middle Board
- Figure 5-36. Disconnecting the Texture Memory Board From the Middle Board
- Figure 5-37. Aligning the Texture Memory Board on the Middle Board
- Figure 5-38. Seating the Texture Memory Option Board
- Figure 5-39. Correctly Seating the Texture Memory Option Board
- Figure 5-40. Seating Push Pins
- Figure 5-41. Reconnecting the Top Board
- Figure 5-42. Replacing the Screws
- Figure 5-43. Seating the Connectors
- Figure 5-44. Reattaching the Flex Connectors
- Figure 5-45. Replacing the Solid IMPACT Graphics Board
- Figure 5-46. Replacing the High IMPACT Graphics Board Set
- Figure 5-47. Board Set that Is Correctly Aligned, Viewed From Above
- Figure 5-48. Replacing the Maximum IMPACT Graphics Board Set
- Figure 5-49. Board Set, Correctly Aligned, Viewed From Above
- Figure 5-50. Replacing the Screws for the High IMPACT Board Set
- Figure 5-51. Replacing the Retention Pin
- Figure 5-52. Closing the Metal Panel in Front of the Graphics Boards
- Figure 5-53. Opening the Metal Panel
- Figure 5-54. Removing the Screws Holding the Board Set
- Figure 5-55. Removing the Retention Pin
- Figure 5-56. Orientation of Wrenches
- Figure 5-57. Removing the XL Graphics Board
- Figure 5-58. Removing the Board Set
- Figure 5-59. Inserting the Solid IMPACT Graphics Board
- Figure 5-60. Connecting the High IMPACT Graphics Board Set to the Midplane
- Figure 5-61. Board Set Correctly Aligned
- Figure 5-62. Reconnecting the Maximum IMPACT Graphics Board Set to the Midplane
- Figure 5-63. Correctly Aligned Board Set
- Figure 5-64. Inserting the Screws for the High IMPACT Board Set
- Figure 5-65. Hanging the Retention Pin
- Figure 5-66. Closing the Metal Panel
- Figure 5-67. Disconnecting the Power Cables From Their Storage Site
- Figure 5-68. Connecting Midplane Power Cables
- Figure 5-69. Replacing the Top Cover
- Figure 5-70. Replacing the Bezel
- Figure 6-1. Releasing the Bezel
- Figure 6-2. Removing the Bezel
- Figure 6-3. Locating the Drive Slots in the Front of the Chassis
- Figure 6-4. Installing an Internal Drive
- Figure 6-5. Replacing the Bezel
- Figure 6-6. Removing the Terminator From the Indigo2 IMPACT Workstation
- Figure 6-7. Removing the Terminator From the Last Device on the Daisy Chain
- Figure 6-8. Connecting an External SCSI Device to the Indigo2 IMPACT Workstation
- Figure 6-9. Daisy-Chaining an External SCSI Device to Another External SCSI Device
- Figure 6-10. Attaching a Terminator to an External SCSI Device
- Figure 6-11. Connecting the Power Cable to an External Device
- Figure 6-12. CD-ROM Icon
- Figure 6-13. Locating the Serial Ports on the Back of the Indigo2 IMPACT Workstation
- Figure 6-14. Connecting the Serial Cable to the Serial Port on the Indigo2 IMPACT Workstation
- Figure 6-15. Audio Ports on the Back of the Indigo2 IMPACT Workstation
- Figure 6-16. Connecting an Audio Device to the Indigo2 IMPACT Workstation
- Figure 8-1. System Shutdown Caution Notifier
- Figure 8-2. System Shutdown Notifier
- Figure 8-3. Okay to Power Off Notifier
- Figure 8-4. Pressing the Reset Button
- Figure 8-5. Starting Up the System Notifier
- Figure 8-6. Confidence Tests Form
- Figure 8-7. Audio Confidence Test Form
- Figure 8-8. Keyboard Test
- Figure 8-9. Pressing the Reset Button
- Figure 8-10. System Start-up Notifier
- Figure 8-11. System Recovery Menu
- Figure 8-12. Media Request Notifier
- Figure 8-13. Enter Password Prompt
- Figure 8-14. Locating the Password Jumper
- Figure 8-15. Disabled Password Notifier
- Figure 9-1. Opening the Front Cover
- Figure 9-2. Powering Off the System
- Figure 9-3. Releasing the Bezel
- Figure 9-4. Removing the Bezel
- Figure 9-5. Releasing the Top Cover
- Figure 9-6. Removing the Top Cover
- Figure 9-7. Locating the PROM Chip on the System Board
- Figure 9-8. Removing the PROM Chip
- Figure 9-9. Lining Up the PROM Chip
- Figure 9-10. Pressing the PROM Chip Into the Socket
- Figure 9-11. Loosening the Screws on the 5-1/4" Drive Tray
- Figure 9-12. Removing the CPU Module
- Figure 9-13. Installing New CPU Module
- Figure 9-14. Replacing the 5-1/4" Drive Tray
- Figure 9-15. Locating the SCSI Cable
- Figure 9-16. Removing the Drive Tray
- Figure 9-17. Removing the Power Supply Screws
- Figure 9-18. Disconnecting the Power Cable to the Drives
- Figure 9-19. Removing the Midplane Power Cables
- Figure 9-20. Removing the Baseboard Power Cables
- Figure 9-21. Sliding the Power Supply Forward
- Figure 9-22. Lifting the Power Supply From the Chassis
- Figure 9-23. Disconnecting the Terminated Midplane Power Supply Cables
- Figure 9-24. Connecting the Power Cable to the Drives
- Figure 9-25. Installing the Power Supply
- Figure 9-26. Replacing the Screws
- Figure 9-27. Connecting the Power Cables to the Baseboard
- Figure 9-28. Connecting the Midplane Power Cables
- Figure 9-29. Replacing the 5-1/4" Drive Tray
- Figure 9-30. Replacing the 5-1/4" Drive Tray
- Figure 9-31. Replacing the Top Cover
- Figure 9-32. Replacing the Bezel
- Figure 10-1. Attaching the Workstation Stand to the Workstation
- Figure 10-2. Placing Your Workstation Under Your Desk
- Figure 10-3. Basic Parameters of VDT Workstation Adjustment (Adapted From ANSI/HFS 100-1988)
- Figure A-1. 4D Compatible Serial Port Pinout Assignments
- Figure A-2. Macintosh SE Compatible Serial Port Pinout Assignments
- Figure A-3. Parallel Port Pinout Assignments
- Figure A-4. Ethernet 10-BASE T Port Pinout Assignments
- Figure A-5. Ethernet AUI Port Pinout Assignments
- Figure A-6. Keyboard Port Pinout Assignments
- Figure A-7. Mouse Port Pinout Assignments
- Figure A-8. SCSI Port Pinout Assignments
- Figure A-9. Monitor Pinout Assignments
- Figure A-10. Video Pinout Assignments
- Figure B-1. Opening the Front Cover of the Indigo2 IMPACT Workstation
- Figure B-2. Turning On the Indigo2 IMPACT Workstation
- Figure B-3. System Startup Notifier
- Figure B-4. Keyboard Layout Form
- Figure C-1. Back of Chassis
- Figure C-2. Interior of Workstation